LMS Compliance Standard

Reliable LMS Calendar Sync

Stop chasing employees. Push 100% accurate schedules directly to Outlook/Google calendars. Fixes RRULE errors.

  • Direct-to-Device Delivery
  • Fixes Recurring Event (RRULE) breakage
  • Timezone Injection for Virtual Training

Audit Workday Learning Feed

Paste the URL of your broken calendar feed

Paste your feed URL above to see specifically what's broken.

Infrastructure Audit

Common Workday Learning Violations

We've analyzed thousands of Workday Learning calendar feeds. Here are the most common RFC 5545 violations we detect and repair automatically at the network edge.

Missing VTIMEZONE

CriticalFound in 65% of feeds

Calendar feed lacks VTIMEZONE definition for non-UTC times

Impact

Events appear at wrong time on iOS/Android (typically 4-8 hours off)

How Lokr Fixes It

We inject RFC 5545-compliant VTIMEZONE blocks automatically

Technical Details

RFC 5545 §3.6.5 requires VTIMEZONE components for all non-UTC DATETIME values

Missing UID

CriticalFound in 31% of feeds

Events lack unique identifier property

Impact

Calendar clients reject events or create duplicates on every sync

How Lokr Fixes It

We generate RFC 4122-compliant UUIDs for all events

Technical Details

RFC 5545 §3.8.4.7 mandates UID property for all VEVENT components

Overlapping Events (Same UID + Time)

CriticalFound in 19% of feeds

Duplicate events with identical UID and start time

Impact

Calendar clients show flickering events or sync loops

How Lokr Fixes It

We detect and remove duplicate events, keeping most recent version

Technical Details

RFC 5545 allows same UID for updates, but not simultaneous duplicates

3

Total Error Types

3

Critical Errors

100%

Fixed Automatically

<15ms

Repair Latency

Technical Deep Dive

Why Workday Learning Feeds Fail

Integration with legacy systems like Workday Learning requires infrastructure-level remediation to ensure mobile sync reliability.

Timezone Drift

Workday invites often default to the tenant's timezone (e.g., PST) rather than the user's local time, causing employees to miss sessions.

14:00 GMT

09:00 EST

VTIMEZONE Injected

Outlook Compatibility

'Add to Calendar' buttons frequently generate .ics files that Outlook treats as 'not supported' due to strict formatting rules.

Detailed Error

The VEVENT contains a property that is not supported by Microsoft Exchange.

Line 42: X-WIDGET-ID: 998...
Status: REJECTED
Cancel
Fix with Lokr

Mobile Sync Failures

Invites may not propagate to iOS or Android devices if the underlying .ics feed lacks proper VTIMEZONE definitions.

Sept
Workday Learning Proxy Mechanics

How to fix Workday Calendar Feeds

1

Go to your Workday Learning dashboard.

2

Locate the 'My Learning' or 'My Schedule' section.

3

Look for the 'Subscribe to Calendar' or 'Export to Calendar' link.

4

Copy the URL and paste it into Lokr above.

5

We'll generate a repaired, RFC-compliant URL for your Outlook or Google Calendar.

Trusted by Workday Learning Teams

We don't sell to end-users. We build for the engineers and admins who have to keep the systems running.

"Cornerstone completion rates dropped because training sessions weren't showing up on mobile. Routed the feed through Lokr, and attendance jumped 40%."

Michael B.

L&D Director, International Retailer

"Workday Learning exports broken RRULEs for recurring compliance training. Lokr repairs the logic so the series actually populates."

Jennifer H.

LMS Administrator, Healthcare Network

"Our SAP SuccessFactors calendar feed was unreadable by standard iPhone calendars. Lokr normalized it to standard RFC 5545."

Tom W.

Enterprise Systems Lead, Automotive Manufacturer

Vertical Support

Industry Applications

Workday Learning is a critical component for these industries. See how Lokr provides infrastructure-grade calendar sync for each specific vertical.

Free Audit & Trial

$0

Diagnose errors and test the fix instantly.

  • 14-Day Free Trial
  • Full repair engine
  • Unlimited diagnostic tests
  • RFC 5545 validation report
Start Free Trial

Starter

$999 USD/year
· $83 / month

Fix one critical feed.

  • 14-Day Free Trial
  • Full repair engine
  • 1 LMS Feed (e.g. Onboarding)
  • Workday/Cornerstone compatible
  • Email support
Start Free Trial
Most Popular

Standard

$4,999 USD/year
· $416 / month

Department-wide infrastructure.

  • 14-Day Free Trial
  • Full repair engine
  • 10 Training Tracks
  • Compliance Reporting Data
  • Priority L&D support
Start Free Trial

Enterprise

Custom

Organization-wide infrastructure.

  • Global LMS Infrastructure
  • SSO/SAML Integration
  • Dedicated Success Manager
  • SOC2 Data Privacy

Standardizing LMS feeds ensures RFC 5545 compliance across all employee devices.

Automate mandatory compliance schedules.

Contact Sales, we’ll set up your perfect feed today.

Frequently Asked Questions

Yes. Workday generates non-standard ICS files that Outlook rejects. Lokr rebuilds the file structure to be fully compatible with Microsoft Exchange.

Ready to fix Workday Learning forever?

Stop fielding support tickets about broken calendars. Get a verified, RFC-compliant feed today.