Industry analysis, implementation case studies, and strategic perspectives on calendar infrastructure.

Introduction It started with a single support ticket at 2:00 AM: "My class schedule is off by one hour on my iPhone." By 8:00 AM, the Registrar's office was flooded. Over 1,100 students were reporting missed classes, incorrect exam times, and total calendar chaos. The culprit wasn't the students or their phones. It was a legacy SIS export that ignored RFC 5545.

Zero-Touch Recovery: Fixing 1,142 RFC Errors in a Legacy SIS Feed How Lokr stopped an infrastructure crisis and cleared student support debt without a single mainframe code change.

That "1 Hour Off" Support Ticket We have all been there. You spend weeks perfecting a calendar integration only to get a message from a user complaining that every single meeting is showing up an hour late in Outlook.